Other Projects |
| |
Biltmore Hotel
-
Phoenix, AZ
Steel fabrication shop drawings for new stairway and equipment
platform.
Status: Drawings completed. 11/86 |
 |
Hillcrest
Country Club Clubhouse Improvements -
Boise, ID
Remodel of Kitchen, Dining Rooms, Lounge & Bar
(Note: Participated on the Design Team, but was not the Lead
Architect)
Status: Construction documents completed. 2/96 |
 |
Downtown Development Guidelines Committee
-
Nampa, ID
Sat on all-volunteer committee that drafted guidelines for downtown
business owners to promote the preservation of Nampa's historic
downtown.
Status: Guidelines published. 8/97 |
 |
Amgen Inc. -
Thousand Oaks, CA
32,000 Sq. Ft. biotech research facility tenant improvement.
Design-build, fast-track
Status: Construction completed. 10/90 |
 |
Information Kiosk
for MK Nature Center - Boise, ID
Design & documentation of new kiosk building
Status: Manual completed. 2/93 |
 |
Rivers End
Clubhouse - Eagle, ID
2,114 Sq. Ft. Clubhouse Building for 106 acre
residential development
Status: Design review approval. 1/02 |
 |
Fly Boise Air -
Boise, ID
3,200 Sq. Ft. Indoor Skydiving Facility
Status: Preliminary design. 11/01 Project on hold. |
 |
Storage Canopy & Vehicle Wash-bay
Addition - Boise, ID
Improvements for the Main Post Office at 13th St. in
Boise
Status: Construction documents completed. 11/96 |
 |
Birch Road Storage -
Nampa, ID
Preliminary Design For 5-Acre Self-Storage Project
Status: Design concept complete. 8/04 |
 |
Master plan for Multi-use Development
- Boise, ID
Concept design and master plan for 34 acre multi-use
development to include, retail, office, assisted living,
educational, and townhouse residential uses.
Status: Plan completed. 11/01 Project on hold. |